Bridge Construction Double Box Girder Launching Gantry Equipment

US$300,000.00 - 1,500,000.00 1 Set (MOQ)
Port:
Qingdao, China
Production Capacity:
40 Sets/Year
Payment Terms:
L/C, T/T

Last Login Date:

May 05, 2025

Main Products:

Cantilever Forming Traveller, Segment Box Girder Formwork, Cable-Stayed Forming Traveller, Pier Formwork, T Beam Formwork, U Beam Fromwork, Hydraulic Tunnel Lining Trolley, Bailey Bridge, U Type Z Type Larsen Steel Sheet Pile, Segment Launching Gantry

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
TY-III
After-sales Service
Technical Guidance
Warranty
1 Year
Certification
ISO9001
Condition
New
Operation Form
Crane Console
Maximum Lifting Height
30-40m
Maximum Lifting Weight
20-50t
Main Girder Form
Double Girder
Type
Beam
Core Components
PLC, Engine, Bearing, Gearbox, Motor, Gear, Pump
Rated Lifting Moment
16000kn
Girder Type
Box & Truss
Maximum Transverse Slope
5%
Minimum Working Curve Radius
600m
Rated Loading Capacity
1600ton
Max. Lifting Height
60m
Span
30m-50m
Speed of Erection of Girder
10 Days/Span
Main Electrical Parts
Schnider, Simens or as Request
Trademark
TONGYAO
Transport Package
40" Ot
Specification
40m
Origin
China

Product Description

Product Description

Both the overhead and underslung launching gantry (LG) consist of two independent self-supporting main structures combined with advanced lifting equipment, creating an exceptionally flexible system for both the balanced cantilever and the span by span method.

Segment Launching Gantry
Segmental underslung launching gantry equipment crane is generally used in the erection of the Highway Bridge and Subway Bridge, using the precast segmental prestress concrete box beam (PC beam) assembly. The main feature is the high efficiency of construction and self-traveling. Generally it is composed of the main beam, leg and winch trolley, the main girder is used for bearing, the leg is to execute machine transverse moving, longitudinal moving, leveling, support, cross span, cross scale and other functions, and the winch trolley used for lifting the precast girder.


Products Show

Packing & Delivery

Packing 
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying; 
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.

 

Delivery 
1. If the size of Segmental underslung launching gantry equipment crane are suitable for container ship, usually by container;
2. If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.

 

Delivery time 
Within 30 to 40 working days after the receipt of deposit.

 

Transportation 
Generally 35 days to 50 days to destination port.


About us

Shandong Tongyao Heavy Industry Co.,Ltd (STHI) is an Professional High-tech Enterprise, Which is dedicated to the Research & Development, Manufacturing, Selling, Leasing and Consulting of Bridge Formworks and Road & Bridge and Tunnel Construction Equipment. The company was established in 2015, locating in Binzhou City of Shandong Province China, and now is the bench-marking  enterprise of Road and Bridge Construction Equipment System.
Since its inception, the company has scrupulously abided by the values of "creating value for customers, opportunity for employees, and benefit for the society" and concentrated on providing our global clients with diversified products application solutions and creating the most valuable TongYao international brand. Till now, we have more than 40 kinds of products, including bridge steel structure, launching girder, form traveler, segment girder and hydraulic climbing formwork etc., which being widely used in bridge, municipal projects, water conservancy, tunnel, nuclear power and some other large projects. With the help of professional logistic system and after-sale service team, we strive to achieve the total logistic radiation of the key area throughout the world, and make sure the rapid integration and scientific allocation of the resources.
     
Certifcations


Customer Photos



FAQ

1. What's the information should I provide when inquiry about the Segmental underslung launching gantry equipment crane?
a .we need the Bridge Drawing, the Maximum longitudinal slope and the Maximum Transverse slope.
b. The Girder/beam drawing.

2. How many Personnel and equipment to assemble Segmental underslung launching gantry equipment crane in the worksite we need?
Personnel: 8 to 10 workers equipment
Truck crane > 50 t : 2 sets
Φ19.5 steel wire rope 8 m: 4 ropes
Sleepers: several
Electric welding machine: 1 set
Oxygen, acetylene: 1 set
Hammer(12 pound and 8 pound): 1 set for each
Wrench and pincher: several 
Gradienter: 1 set

3. What are inspection standard for load test of Segmental underslung launching gantry equipment crane?
Dynamic load test
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overhead.

 

Static load test
1.25 times rated load, all mechanisms work well, the crane stops 20 min to 30 min as trial load is lifted 10 cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper chamber, repeat 3 times, steel structure does not have permanent deformation.

4. How to make highway bridge concrete girders?
a. Full span prefabrication.
b. Segment girder prefabrication.
c. Full span cast in place girder.
d. Segment cast in situ.

5. How about maintenance of Segmental underslung launching gantry equipment crane?
a. Lubricating.  b. Steel wire rope.  c. Spreader.  d. Pulley block.  e. Wheels.  f. Brake.

Send your message to this supplier
Mr. Jacky Wang

Post a Sourcing Request Now

People who liked this also liked