Form Traveler for Cable Stayed Bridge Mould Bridge Concrete Casting Steel Formwork

US$100,000.00 - 1,000,000.00 1 Set (MOQ)
Port:
Qingdao, China
Production Capacity:
50000tons/Year
Payment Terms:
L/C, T/T, D/P

Last Login Date:

May 05, 2025

Business Type:

Manufacturer/Factory, Trading Company, Group Corporation

Main Products:

Cantilever Forming Traveller, Segment Box Girder Formwork, Cable-Stayed Forming Traveller, Pier Formwork, T Beam Formwork, U Beam Fromwork, Hydraulic Tunnel Lining Trolley, Bailey Bridge, U Type Z Type Larsen Steel Sheet Pile, Segment Launching Gantry

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
TY-III
After-sales Service
Installation Instruction
Warranty
1 Year
Certification
ISO, SGS
Material
Steel
Type
Beam Formwork
Product Description
Cable-Stayed Forming Traveller
Certificate
ISO9001
Main Spans Length
128m
Trademark
Tong Yao
Transport Package
40"Ot
Specification
Assembly part
Origin
China

Product Description

Product Description 

Cable-Stayed Forming Traveller

Cantilever casting of cable-stayed bridge mainly uses cable-Stayed Forming Traveller. In the cantilever construction of long section, large weight, wide main beam and single cable plane cable-stayed bridge, the conventional Forming Traveller structure has some defects, such as excessive and concentrated stress on anchor point of concrete main beam and poor lateral stability of hanging Forming Traveller. In view of the defects and shortcomings of the conventional Forming Traveller in cable-stayed bridge construction, we designed a new Forming Traveller structure -- composite cable Forming Traveller The structure design of the Forming Traveller is safe and reliable, the force is clear and reasonable, the operation is simple, and the comprehensive performance is superior.
 
Product DescriptionCable-Stayed Forming Traveller
 
OriginChina/FTATrademark
 
TY-FORMWORK
Certificate
 
ISO9001
 
Production Capacity
 
4000 Tons /Month
 
Main Spans
 
64m~200m
Transport Package
 
Export Standard Packing
 
Design Calculation

 
MIDAS
 
Sructural style
 
Modular Bolting /Welding
 
Method of assembly
 
On-site
 
Technical guidance
 
YESDrawing supplied
 
Assembly drawings
 

Products Show


Packing & Delivery
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.



About us

Shandong Tongyao Heavy Industry Co.,Ltd(STHI) is an Professional High-tech Enterprise, Which is dedicated to the Research & Development, Manufacturing, Selling, Leasing and Consulting of Bridge Formworks and Road & Bridge and Tunnel Construction Equipment. The company was established in 2015, locating in Binzhou City of Shandong Province China, and now is the bench-marking  enterprise of Road and Bridge Construction Equipment System.
Since its inception, the company has scrupulously abided by the values of "creating value for customers, opportunity for employees, and benefit for the society" and concentrated on providing our global clients with diversified products application solutions and creating the most valuable TongYao international brand. Till now, we have more than 40 kinds of products, including bridge steel structure, launching girder, form traveler, segment girder and hydraulic climbing formwork etc., which being widely used in bridge, municipal projects, water conservancy, tunnel, nuclear power and some other large projects. With the help of professional logistic system and after-sale service team, we strive to achieve the total logistic radiation of the key area throughout the world, and make sure the rapid integration and scientific allocation of the resources.
                    
Certifcations


Customer Photos



FAQ

1. Where is your factory?

Our factory is located in Binzhou city, Shandong province, where is 350km far from Beijing, 200km far from Tianjin port. 

2. How fast can my order be delivered?

Ex works delivery is usually 30 days after receipt of your contract and advance payment.

3. What's the material of your products?

Steel GB Q235B or Q345B. 

4. What's your payment term?

 

1) 50% TT in advance, balance before shipment.

2) 50% TT in advance, 50% by Irrevocable l/C at sight.




 
Send your message to this supplier
Mr. Jacky Wang

Post a Sourcing Request Now

People who liked this also liked