Precast U Girder Mould, U Girder Moulds, U Beam Formwork, U Beam Forms
US$1,500.00 - 1,900.00 | 1 Ton (MOQ) |
Port:
Qingdao, China
Production Capacity:
50000tons/Year
Payment Terms:
L/C, T/T
Shandong Tongyao Heavy Industry Co., Ltd
Shandong, China
Last Login Date:
May 05, 2025
Main Products:
Cantilever Forming Traveller, Segment Box Girder Formwork, Cable-Stayed Forming Traveller, Pier Formwork, T Beam Formwork, U Beam Fromwork, Hydraulic Tunnel Lining Trolley, Bailey Bridge, U Type Z Type Larsen Steel Sheet Pile, Segment Launching Gantry
Find Similar Products
Product Description
Company Info
Basic Info.
After-sales Service
Technical Guidance
Warranty
1 Year
Certification
ISO
Material
Steel
Type
Beam Formwork
Certificate
ISO9001
Design Calculation
Midas
Length of Beam
30 M
Trademark
STH
Transport Package
40" Ot
Specification
30 m
Origin
China
Product Description
Product Description
The opening U-Beam is applied in the upper structure of U-Beams and replace the traditional structure of box girder, The underground railway is directly paved on the bottom structure of U-Beams. The webs on both sides of U-Beams can be effectively preventing noise from vehicle wheel of subway.
The top flange of U-Beam it should be at the same height as baseplate of the metro vehicles. In case of emergency, It also can be used for Emergency evacuation routes to provide convenience for passengers. Meanwhile, because of vehicle is protected by the side web plate of U-Beam, So there is no need to consider of collision avoidance function,
Basic Construction
The U-Beam were precast at the beam fabricating yard, Which composed by High and low side of the formwork, soffit formwork and end formwork. With compared to rectangular beam , It can be save the concrete and reduce the structural weight and also Improve the spanning capacity.
The Processes of U-Beam Formwork used by Integrated Paving and assembly welding method. Make sure that close piecing and without height difference ensure that its overall size for the formworks. The diaphragm plate formworks of U-Beams which should set the ejection gradient according to the principle of "big top and small bottom" and "small inside and big outside"
Products Show
Packing & Delivery
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
About us
Shandong Tongyao Heavy Industry Co.,Ltd(STHI) is an Professional High-tech Enterprise, Which is dedicated to the Research & Development, Manufacturing, Selling, Leasing and Consulting of Bridge Formworks and Road & Bridge and Tunnel Construction Equipment. The company was established in 2015, locating in Binzhou City of Shandong Province China, and now is the bench-marking enterprise of Road and Bridge Construction Equipment System.
Since its inception, the company has scrupulously abided by the values of "creating value for customers, opportunity for employees, and benefit for the society" and concentrated on providing our global clients with diversified products application solutions and creating the most valuable TongYao international brand. Till now, we have more than 40 kinds of products, including bridge steel structure, launching girder, form traveler, segment girder and hydraulic climbing formwork etc., which being widely used in bridge, municipal projects, water conservancy, tunnel, nuclear power and some other large projects. With the help of professional logistic system and after-sale service team, we strive to achieve the total logistic radiation of the key area throughout the world, and make sure the rapid integration and scientific allocation of the resources.
Certifcations
Customer Photos
FAQ
U Beam Formwork
IntroductionThe opening U-Beam is applied in the upper structure of U-Beams and replace the traditional structure of box girder, The underground railway is directly paved on the bottom structure of U-Beams. The webs on both sides of U-Beams can be effectively preventing noise from vehicle wheel of subway.
The top flange of U-Beam it should be at the same height as baseplate of the metro vehicles. In case of emergency, It also can be used for Emergency evacuation routes to provide convenience for passengers. Meanwhile, because of vehicle is protected by the side web plate of U-Beam, So there is no need to consider of collision avoidance function,
Basic Construction
The U-Beam were precast at the beam fabricating yard, Which composed by High and low side of the formwork, soffit formwork and end formwork. With compared to rectangular beam , It can be save the concrete and reduce the structural weight and also Improve the spanning capacity.
The Processes of U-Beam Formwork used by Integrated Paving and assembly welding method. Make sure that close piecing and without height difference ensure that its overall size for the formworks. The diaphragm plate formworks of U-Beams which should set the ejection gradient according to the principle of "big top and small bottom" and "small inside and big outside"
Product Description | T Beam Formwork | Origin | China/FTA | Trademark | TY-FORMWORK |
Certificate | ISO9001 | Production Capacity | 4000 Tons /Month | Main Spans | 20m~40m |
Transport Package | Export Standard Packing | Design Calculation | MIDAS | Sructural style | Modular Bolting /Welding |
Method of assembly | On-site | Technical guidance | YES | Drawing supplied | Assembly drawings |
Products Show
Packing & Delivery
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
About us
Shandong Tongyao Heavy Industry Co.,Ltd(STHI) is an Professional High-tech Enterprise, Which is dedicated to the Research & Development, Manufacturing, Selling, Leasing and Consulting of Bridge Formworks and Road & Bridge and Tunnel Construction Equipment. The company was established in 2015, locating in Binzhou City of Shandong Province China, and now is the bench-marking enterprise of Road and Bridge Construction Equipment System.
Since its inception, the company has scrupulously abided by the values of "creating value for customers, opportunity for employees, and benefit for the society" and concentrated on providing our global clients with diversified products application solutions and creating the most valuable TongYao international brand. Till now, we have more than 40 kinds of products, including bridge steel structure, launching girder, form traveler, segment girder and hydraulic climbing formwork etc., which being widely used in bridge, municipal projects, water conservancy, tunnel, nuclear power and some other large projects. With the help of professional logistic system and after-sale service team, we strive to achieve the total logistic radiation of the key area throughout the world, and make sure the rapid integration and scientific allocation of the resources.
Certifcations
Customer Photos
FAQ
1. Where is your factory?
Our factory is located in Binzhou city, Shandong province, where is 350km far from Beijing, 200km far from Tianjin port.2. How fast can my order be delivered?
Ex works delivery is usually 30 days after receipt of your contract and advance payment.3. What's the material of your products?
Steel GB Q235B or Q345B.
4. What's your payment term?
1) 50% TT in advance, balance before shipment.
2) 50% TT in advance, 50% by Irrevocable l/C at sight.
Send your message to this supplier
People who liked this also liked