Box Girder Formwork Steel Formwork Construction Formwork From China

US$1,700.00
10-99 Tons
US$1,500.00
100+ Tons
Port:
Qingdao, China
Production Capacity:
50000tons/Year
Payment Terms:
L/C, T/T

Last Login Date:

May 05, 2025

Business Type:

Manufacturer/Factory, Trading Company, Group Corporation

Main Products:

Cantilever Forming Traveller, Segment Box Girder Formwork, Cable-Stayed Forming Traveller, Pier Formwork, T Beam Formwork, U Beam Fromwork, Hydraulic Tunnel Lining Trolley, Bailey Bridge, U Type Z Type Larsen Steel Sheet Pile, Segment Launching Gantry

Find Similar Products

Product Description

Company Info

Basic Info.

After-sales Service
Installation Guide
Warranty
1 Year
Certification
ISO
Material
Steel
Type
Beam Formwork
Certificate
ISO9001
Segment Length
4m
Design Calculation
Midas
MOQ
10 Tons
Form Stripping
Hydraulically
Trademark
Tong Yao
Transport Package
40" Ot
Specification
4m
Origin
China

Product Description

Product Description

Segment Box Girder Formwork

Precast Girder Formwork Technique Direction 
 
1. Technique Content
Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.

2. Technical index:
 (1)Arbitrary point normal deviation of actual contour with designed contour ≤2mm;
 (2)The mould surface radian is accordant.Deviation of dislocation and gap ≤0.5mm;
 (3)Deviation of every single plate manufactured length and width±1mm 
 (4)Deviation of planeness ≤3mm/2m;
 (5)Deviation of mould assembling length  ±10mm;
 (6)Deviation of bottom mould midline ≤2mm;
 (7)Deviation of bridge panel with bottom mould midline ≤10mm
 (8)Deviation of web plate midline ≤10mm
 (9)Deviation of bulk head center ≤5mm
 (10)Mould inclination ≤3‰
 (11)Pedestal plates unevenness ≤1mm
 (12)Deviation of end mould anchor recess ≤3mm
Product DescriptionSegment Box Girder FormworkOriginChina/FTATrademark
 
TY-FORMWORK
Certificate
 
ISO9001
 
Production Capacity
 
4000 Tons /Month
 
Main Spans
 
64m~200m
Transport Package
 
ExportStandard Packing
 
Design Calculation

 
MIDAS
 
Sructural style
 
Modular Bolting /Welding
 
Method of assembly
 
On-site
 
Technical guidance
 
YESDrawing supplied
 
Assembly drawings
 
 (13)Turnover frequency: more than 50 times


Products Show

Packing & Delivery
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 

Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.



About us

Shandong Tongyao Heavy Industry Co.,Ltd (STHI) is an Professional High-tech Enterprise, Which is dedicated to the Research & Development, Manufacturing, Selling, Leasing and Consulting of Bridge Formworks and Road & Bridge and Tunnel Construction Equipment. The company was established in 2015, locating in Binzhou City of Shandong Province China, and now is the bench-marking  enterprise of Road and Bridge Construction Equipment System.
Since its inception, the company has scrupulously abided by the values of "creating value for customers, opportunity for employees, and benefit for the society" and concentrated on providing our global clients with diversified products application solutions and creating the most valuable TongYao international brand. Till now, we have more than 40 kinds of products, including bridge steel structure, launching girder, form traveler, segment girder and hydraulic climbing formwork etc., which being widely used in bridge, municipal projects, water conservancy, tunnel, nuclear power and some other large projects. With the help of professional logistic system and after-sale service team, we strive to achieve the total logistic radiation of the key area throughout the world, and make sure the rapid integration and scientific allocation of the resources.
                    
Certifcations


Customer Photos



FAQ

1. Where is your factory?

Our factory is located in Binzhou city, Shandong province, where is 350km far from Beijing, 200km far from Tianjin port. 
  1. How fast can my order be delivered?
Ex works delivery is usually 30 days after receipt of your contract and advance payment.
  1. What's the material of your products?

Steel GB Q235B or Q345B. 

  1. What's your payment term?
 
  1. 50% TT in advance, balance before shipment.
  2. 50% TT in advance, 50% by Irrevocable l/C at sight.





 
Send your message to this supplier
Mr. Jacky Wang

Post a Sourcing Request Now

People who liked this also liked